Everything in the first few weeks is about getting the roots into the ground. Until they go down, a new roll of turf is basically a bath mat. It looks like a lawn, but it’s just lying there.
When should you first water new turf?
Straight away. Turf Australia’s guide says within 30 minutes of laying, soaked but not saturated.
Don’t wait until the whole lot’s down to start watering. Give each section a soak as you finish it, so the first rolls aren’t baking while you lay the last ones.
How much should you water new turf?
The aim is simple: don’t let it dry out while it establishes, which usually takes a couple of months. Hot weather may need several light waterings. Guides differ on exact schedules, so I’d go by the turf and the weather, not a timetable off the internet.
On very hot days, a short cooling spray can help. Do it within the local rules, which are worth knowing.
Central Coast’s Water Wise Rules let you use sprinklers and watering systems as needed to establish a new lawn, for 14 days from installation. Otherwise, lawn watering is before 10am or after 4pm. That wording is about sprinklers and watering systems, so check the page if you plan to use a hand-held hose outside those hours. Restrictions can apply when dam levels fall, and they can change all of this, so have a look before your turf arrives.
Once the roots are established, water only when rain isn’t enough. The weather through the year is in the mowing year, if you’re trying to work out what you’re in for.
When can you first mow new turf?
When the turf tells you, and that’s the part that matters. Day counts vary a lot between guides, and cooler weather takes longer, so I don’t work to one.
Use the root test, which is how Lawn Solutions Australia’s guides do it:
- A few days after laying, start checking, and keep checking every few days.
- Lift a corner of a roll or slab.
- If it lifts, give it longer and keep the water up.
- If it won’t lift, the roots have gone down and it’s ready to mow.
Turf Australia adds that it should be about 6cm high and tightly rooted first.
Test more than one corner, including a sunny edge and a shady bit. Turf doesn’t always root at the same speed across a yard, and it’s the slow part you’re mowing for.
How do you do the first mow?
Set the mower high and take only the tips. No more than a third of the leaf, then bring the height down over the next few mows.
Watch the weather as well. Cut leaves take several hours to seal, so don’t mow just before hot weather, or water afterwards if you have to.
Put a sharp blade on for that first mow, and take your turns wide and slow. New turf’s only just got hold, and a torn leaf or a spinning wheel is the last thing it wants.
What about feeding, weeds and foot traffic?
Three things to hold off on:
- Heavy traffic. Avoid it for the first month.
- Fertiliser. Turf Australia says to feed at about six weeks, then water deeply. Lawn Solutions Australia says 6 to 8 weeks. Follow the label.
- Weed killer. Avoid it until the lawn’s established, and pull weeds by hand instead.
After that, it needs what any lawn needs, which I’ve covered in why a mown lawn doesn’t stay green.
Who lays the turf?
Turf suppliers deliver it. They don’t lay it. If you’d rather not do it yourself, turf laying is a job I do. Photos of the area and your suburb are all I need for a quote, and you’ll have it within 24 hours.
General advice only. Always follow the product label.